Russians are constantly shelling energy infrastructure, including the largest power generation facility, the Dnipro Hydroelectric Power Plant. In the event of a power outage, a humanitarian catastrophe will occur for the residents of Zaporizhzhia and neighboring communities, who will be left without drinking water. The installation of this equipment will ensure a sustainable drinking water supply for all consumers in Zaporizhzhia region.
Project Objective: To improve energy security and ensure uninterrupted operation of the critical infrastructure of the city and neighboring communities in the event of a blackout by installing alternative power sources and frequency converters.
Effect:
✅ Maintaining a stable hydraulic regime and improving the reliability of hydraulic equipment
✅ Provision of electricity to the facilities of a utility company that provides centralized water supply during emergency and planned power outages
✅ Provision of uninterrupted water supply to 3045 apartment buildings, 294 social facilities (hospitals, educational institutions), indestructibility points and 623 other infrastructure facilities
✅Providing the city with fire water supply
Needs:
➡️ Financial: funds for the purchase of alternative power sources for water supply stations and frequency converters
➡️ Technical: development of design and estimate documentation and subsequent installation of equipment using specialized machinery
➡️ Logistics: delivery of the necessary equipment and machinery to the installation site
Total project cost: EUR 5.6 million.