
Problem: The primary school building of the main educational institution was built in 1962. It was damaged as a result of Russian missile fire (the roof was damaged). Currently, it does not meet modern energy efficiency requirements and needs a comprehensive reconstruction taking into account inclusiveness. The available shelter has limited capacity. Given this, it is impossible to organize a safe educational process for primary school students.
Project goal: to ensure a high-quality and safe educational process in the region in face-to-face format.
Effect:
Implementation of the project will allow the community to:
✅provide full-time education for 200 primary school students
✅create an inclusive (barrier-free) educational space
✅ improve the quality of education and make up for educational losses
✅reduce budget costs for maintaining an elementary school building through energy efficiency
✅create safe conditions for the stay of students and staff of the educational institution through the construction of a shelter
Need:
➡️insulation of an elementary school building
➡️thermal insulation of roof and ceiling
➡️construction materials for shelter repairs
➡️school furniture
➡️sanitary and hygienic equipment
Total project cost: 4.2 million euros.